Company profile

Established in 1991, KHK Scaffolding & Formwork LLC has become the leading manufacturer and supplier of scaffolding and formwork systems. Relying on top quality and high credit standing, our scaffolding products and solutions have won high praise from customers around the world.

KHK Scaffolding & Formwork LLC is a subsidiary of Taurani Holdings Ltd, Dubai that has been recognized as one of the most successful conglomerates in United Arab Emirates.

The company covers an area of 75,000 sqm, efficient 1,200 employees and is equipped with most advanced machinery and equipment to manufacture various types of scaffolding and formwork systems as per customers’ designs or samples.

Over 28 years, our products have been exported to more than 50 countries mainly in GCC, Middle East, Europe, America, Asia and Australia. We don’t only manufacture and sell world-class products, but also provide design skills and technical advice that helps contractors build their projects in the most secure and economical way.

We are always engaged in developing new product line and improving customer service to meet changing demands from different markets.

HISTORY & MILESTONES

2000
2001
2002
2003
2004
2005
2006
2008
2010
2012
2014
2016
2017
2018
2019

2000

Establishment of Hot Dip galvanizing plant.

2001

Commissioning of automatic electroplating plant

2002

Establishment of two tube mills.

2003

Establishment of Hot Dip Tube galvanizing plant.

2004

Massive expansion in infrastructure and manufacturing capacity (in-built and open space)

2005

Commissioning of fabrication plant and slitting plant for tube mills.

2006

Establishment of Aluminum Scaffolding plant and Aluminum extrusion plant.

2008

Introduction of Robotic Welding for Steel Scaffolding.

2010

Introduction of Robotic Welding for Aluminum Scaffolding, First in the Middle East.

2012

Expansion of Hot Dip galvanizing plant to enhance production capacity from 500-tons to 1200-tons.

2014

Enhancement of tube galvanizing plant from one tube to three tubes at a time, which is the first of its kind in GCC and Asia Pacific.

2016

Commissioning of 2nd Italian powder coating plant with an increase of 50% in production capacity of existing plant.

2017

Upgradation of automatic electroplating plant to double up the existing capacity.

2018

1) Introduction of Independent Sewage Plant (STP) to support our galvanizing plant and Government Green Initiative.
2) We also constructed our Eco-friendly labor camp(400 people capacity) run on 100% Solar power Energy which won us great appreciation from Government of Ajman.
3) We expanded our in-house tools & Die making facilities by adding CNC vertical milling machines, EDM machines and other CNC machines.

2019

1) Incorporation of new Laser Cutting plant for plates, coils and steel sheets.
2) We also setup an automatic plant for production of GI Mesh and Mesh Panels with 120-ton per month capacity.